ACC
All external construction or modifications to Autumn Wind homes must be approved by the ACC (Architectural Control Committee) prior to starting the work.
The ACC Approval form can be downloaded from here
Mail the completed form to acc@autumnwind-hoa.org
CCR section 4-A-2
Approval of plans. All building and structures, including concrete or masonry walls, rockeries, fences, swimming pools, or other structures to be constructed or modified within the Property shall be approved by the ACC. Complete plans and specifications of all proposed buildings, structures and exterior alterations, together with detailed plans showing the proposed location of the same on the particular Building Site, shall be submitted to the ACC before construction or alteration is started, and such construction and alteration shall not be started until written approval is given by the ACC.
The ACC will review submittals as to the quality of workmanship and materials planned and for conformity and harmony of the external design with existing structures on the said Building Sites, and as to the location of the building with respect to topography, finished grade elevation and building set back restrictions.
All plans and specifications for approval by the ACC must be submitted at least ten (10) days prior to the proposed construction and starting date. In the event the ACC fails to approve or disapprove such plans and specifications within thirty (30) days after said plans and specifications have been delivered to it, such approval will not be required.
Roof Replacement
Roof Replacement – Autumn Wind HOA (autumnwind-hoa.org)
Fence Guidelines
Fence Guidelines – Autumn Wind HOA (autumnwind-hoa.org)
External Paint Colors
External Paint Colors – Autumn Wind HOA (autumnwind-hoa.org)
Tree Removal
Tree Removal – Autumn Wind HOA (autumnwind-hoa.org)
Signs
Signs – Autumn Wind HOA (autumnwind-hoa.org)
Solar Panels
Solar Panels – Autumn Wind HOA (autumnwind-hoa.org)
Noise Levels
Noise Levels – Autumn Wind HOA (autumnwind-hoa.org)